混凝土检查井施工要求
添加时间:2019/2/16 15:06:35     浏览次数:
混凝土检查井施工要求
Construction Requirements for Concrete Inspection Well
1、基础做法:井底应夯实,密实度95%以上,铺设10公分碎石或c15垫层。
1. Basic practice: The bottom of the well should be compacted, with a compactness of more than 95%, and 10 cm gravel or C15 cushion should be laid.
2、井筒连接方式:采用企口式,1:2防水砂浆座浆。
2. Wellbore connection mode: enterprise-mouth type, 1:2 waterproof mortar base slurry.
3、检查井与管道连接方式:不同管材分别处理,水泥管应凿毛。用1:2膨胀砂浆处理。其他管材按照管材要求处理。
3. Connection mode between inspection well and pipeline: different pipe materials should be treated separately, and cement pipe should be chiseled. Treated with 1:2 expansive mortar. Other pipes shall be treated according to the requirements of pipes.
混凝土检查井施工 [1]  中,还有很多需要注意的地方,大家在安装过程中要多多注意!
In the construction of concrete inspection wells [1], there are still many points needing attention. We should pay more attention in the process of installation.
上一页  检查井通病原因分析  
下一页  塑料排水检查井施工技术
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

Copyright © 技术支持:遨游网络

  • 联系我们
  • 网上订单
  • 工程案例
  • 本站导航

搜索

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3